Migrating from Turvo
to HatchOS

🚚 12 PagesFree PDFUpdated May 2025

A practical playbook for Turvo operators making the move. Data exports, 14-day timeline, common failure points, and a validation checklist — written by people who've done it.

  • Why brokers leave Turvo (and when it makes sense)
  • Exactly what to export before you start
  • 14-day migration timeline with owners
  • 5 failure points and how to avoid them
  • Post-migration validation checklist

Get the Free Playbook

PDF delivered to your inbox instantly.

No spam. Unsubscribe anytime.

Check your inbox!

Your migration playbook is on its way.

Why Turvo operators switch

Turvo built a capable platform and raised over $225M to get there. The problem for mid-market brokers is that enterprise pricing followed enterprise fundraising. If you're running 5-50 agents, you're paying for a system sized for 500-seat enterprise deployments.

The specific triggers we see most often:

If you've been told you need a 3-month implementation for a 20-agent brokerage, that's the system telling you it wasn't designed for you.

What to export before you start

Do this before your first conversation with a new vendor. Your data is yours — get it out regardless of what you decide.

14-Day Migration Timeline

Days 1-2

Account setup + configuration

HatchOS account creation, admin config, branding setup, user accounts. Vendor handles this — you review.

Days 3-5

Data import

Import carriers and customers from CSV exports. Validate row counts match your Turvo export. Flag any records with missing data (insurance, banking).

Days 6-7

Commission contracts + factor integration

Set up commission contracts per agent. Configure factor associations and payment routing rules. Test a payment end-to-end.

Days 8-9

Dispatcher training

Core workflows: load creation, carrier dispatch, tracking, POD, invoice. 1-2 hours per dispatcher in most cases.

Days 10-12

Parallel operation

New loads go in HatchOS. In-flight loads tracked in both systems. This is your safety net — do not skip it.

Days 13-14

Full cutover

No new entries in Turvo. Archive Turvo access (don't delete — you'll want the history). HatchOS is live.

The 5 failure points

See HatchOS live before you commit

We'll demo the full migration process — carrier import, commission setup, factor routing — in 30 minutes.

Book a Demo →

Related resources